4.22.2015

Uncovering the kitchen

There she is! It's been a while!






































Did I mention I want to get the new countertops for the kitchen now? And cut out this last remaining country details and add custom doors that match the rest to this weird nook now? Didn't think our scope could creep much more.






































So much for the breakfast nook upholstery. Six months under cover has left it moldy and unusable. That's ok, I wanted to check it up anyway. 

4.21.2015

White Dove

That's what it's called. White Dove by Benjamin Moore.

I did my research and across the board, this color is loved.

So we went with it.

And it's looking pretty dreamy!






4.18.2015

Watching bath #3 come to life

I have been fascinated watching this process unfold.

This Francisco dumping water into the shower pan about 6 hours after it was installed. Who knew you had to test it? But yes, makes sense.






































Sadly, it leaked. The closet in the boys room downstairs has new sheetrock on the ceiling now. But better now than later. So the tilers had to re-do and we had to re-schedule the shower pan inspection.

Three days delay but we passed. They can get to the tiling!

And the vanities...

And then the walls...


And then the grout...

I love it. The wall tile and the shower pan herringbone.

BUT, I do I wish I had told them that I wanted the threshold (water barrier) to be the floor tile and not the wall tile to as to have a seamless monochromatic floor color. Now I know to tell them for the master bath.

And I am thinking a darker grout would have been a better look, kind of like the image without the grout.

All a learning lesson.



4.17.2015

Making a custom powder room vanity






































At one point early on, I had a vision for the vanity in the powder room. It's a small space so I din't want to take up a lot of it with a full vanity and pedestal sink. I wanted something floating and wall mounted. I showed John a picture and said "This is the basic idea."

And his interpretation: build a floating vanity out of our old lumber that used to be holding up our house. That's him milling the lumber in our back yard.

Then it looked like this for a while:

Then like this:


And then:

Stay tuned for the final reveal next week!


4.16.2015

First shower walls!

And there are the tub shower walls!




4.09.2015

First sighting of the floor tile!

I did something really lazy: I picked one porcelain tile that I love and it's going in all 3 bathrooms and the laundry room.

Here's the reason: I am trying to create cohesiveness in a house that was all over the map in terms of style, functionality, space planning and floor layout. It is still not perfect but it's really good and a HUGE improvement to how it was before.

One way to create cohesiveness is to stick with a very tight color palette that gets carried throughout every room.

Each bath has very distinct and unique features which will stand out against the foundation of the gray floor.


For months I carried around the sample in order to color match it to the other textures and finishes in each room. And then the boxes of tile sat in the garage for the last 6 weeks, just waiting.

And now, it's in. And it's even better than I imagined.





4.08.2015

Doors are in!






































In the morning they were leaning in the future places.

In the afternoon they were all in!




4.07.2015

How I assembled the laundry cabinets

About 3 weeks ago, I knew it was time to get serious about the cabinets. From day one, I knew we would be using IKEA cabinets in the laundry room. For one, you can't beat the price, anywhere. And two, the look is clean and simple. And three, I was able to get my long, deep drawers which are by far a better choice for storage that shelves with doors, in my opinion. I knew the style, the design and that it all measured 24" deep. Standard depth, no other option.

Then I measured. And I measured again.

And I looked at the plans. And yes indeed, the cabinets were drawn at 18". Which means the door to the powder room was built to allow an 18" deep cabinet, not a 24" one.

So I stressed myself out, looked at other options, thought about just ordering something cheap from Home Depot that would still cost over $1500 and then I just ended up back where I had started: I wanted the IKEA cabinets.

Solution: make the door frame smaller to the powder room and order a new door.

And so we did. Actually John did. And I went shopping.

I came home with a crazy amount of boxes, all of which are not shown below, and knew that I had some solid hours of assembly ahead of me. I could have had John assemble them, but when you pay your contractor his hourly rate of $65 to assemble IKEA cabinets then your IKEA cabinets are not really that inexpensive anymore. And besides, I like the assembly part. I know a lot of people loath Ikea furniture for that reason. I'm a little strange. I get a huge amount of satisfaction when I have indeed completed the task.

My husband took care of the boys and I headed over to a dark and empty house with a flashlight and set of tools. The guys had left one of their work lights on for me and I found a good Pandora station and got to work.

At 7:35PM it looked like this:

At 9:05PM, it was all done:

And by the end of the next day, it looked like this:


PS Those are the floors tiles. I love them!

PSS The old laundry door is not wasted by the way nor a major cash loss. It's put aside and will be the door we use for the storage space in Phase 2. I like it when things turn out that way.





4.06.2015

Trim tools

Trim tools are big. And need lots of space. Luckily, we had some of that.

And then there is the "throw everything else in it" room. High fixtures, vanities, hardware, oh my. It just keeps arriving and right now we have quite a stockpile.

A week from today, this room may just look totally different.





3.30.2015

Waiting for the tapers to finish

Sheetrock is a mess. There is silica dust everywhere. And the tape and glue and white goopy stuff that they use to seal it all up is a mess. And because everything is a mess and the tapers are basically in every corner of every room, everything else is stopped or at least on hold. 

What is not on hold is making decisions. In comes my gratitude for our contractor and his organization and forward thinking. Last Monday, exactly a week ago knowing the delay with our taping crew, he gave me a list and said to have all of this ready by Monday March 30th. On the list: tile, cabinets, railings, confirm painter.

So last week, I ordered the shower wall tile on Tuesday, picked out and loaded the laundry cabinets from IKEA on Tuesday, realized the countertop we had chosen for the laundry doesn't work with the floor tile so added that decision back onto the to do list on Tuesday, looked at new options for countertops on Wednesday, approved the railing design on Wednesday, ordered the undercount laundry sink on Wednesday, verified the floor tile layout on Thursday, confirmed the painter on Friday, picked up the shower wall tile on Friday and then unloaded it all into the garage. Yup, that about covers it.

But today it's Monday, March 30th and I think we're still waiting for the tapers to finish and our new expedited, updated and exciting construction schedule is delayed by 2 days. Installing cabinets and shower pans and starting on interior trim will have to wait. 

New date to get this show on the road: Wednesday April 1st.

Stay tuned.


3.19.2015

Tapers are here!

There is a light at the end of the tunnel. And that light started at 8am this morning when a gaggle of guys arrived with crazy looking Star Wars like stilts and wet goopy paste that is appearing like goose poop all over everything.

But they are here and they aren't 10 days delayed and they are taping it at all up! This is progress people!




3.14.2015

Sheetrock Day One!


















First came the pink stuff.

Then came 100+ sheets of heavy sheetrock that had to be carried up our stairs.

Then came the guys on stilts.

Seriously, this is crazy.

What is even crazier - we are starting to see exactly what this house is going to feel like.