4.24.2015

It's been 2 crazy weeks of carpentry!

It all stared on April 7th. After weeks of emptiness and dust and more dust and more emptiness, the house came back to life and has been buzzing ever since.

The "trades" are all working alongside each other, trying not to get in each other's way nor hold each other up. This has to get done before that but that has to get done after that. It's a like a well oiled machine at the moment and there is one man who is responsible for all of that.

Lucky for us he's also a craftsman and a really good woodworker. Not only is he managing all of this craziness, he's in it. Everyday. And he handiwork is everywhere.

The tall linen storage for the master bath:

The built-in cubbies in bath #3, alongside an Ikea hack vanity:

The powder room vanity:

The stair railing:

And the banister:





No comments: